Real Estate

Selling a Haddonfield Home? The Resale CO, Smoke Detector and Sidewalk Inspections You Need Before Closing

Under contract in Haddonfield? Three borough forms stand between you and the closing table. Here's what each one checks, what it costs and when to file.

By Live Haddonfield ·

Get Live Haddonfield free every Friday. Subscribe.

A ring of house keys and a folded checklist on a porch railing beside potted autumn mums

To sell a house in Haddonfield, you need a borough fire inspection for smoke alarms, carbon monoxide alarms, a fire extinguisher and a visible house number, plus a sidewalk inspection, and every open construction permit has to be closed first. If the home is in the Historic District, there's a disclosure form too. File early: the fire inspection is $56 with 10 days' notice and $201 at the last minute.

Step zero: close your open permits

The borough's resale page says staff check the property's permit history, and if there are open construction permits, every inspection has to pass and the permit has to close before the CO is released. The fire marshals won't even schedule until open permits are closed.

Check now, not the week of closing. Our explainer on when you need a permit in Haddonfield helps you figure out what might be open.

Applications go to the Construction and Zoning Office, Room 104, Borough Hall, 242 Kings Highway East, by cash or check payable to the Borough of Haddonfield.

1. The fire inspection

Borough Code 114-8(B) requires a Bureau of Fire Prevention inspection before any home sale closes. Inspectors check four things:

  • Smoke alarms on every level. Battery-only units must be the 10-year sealed type.
  • A carbon monoxide alarm outside the bedrooms, if the house has a fuel-burning appliance or an attached garage.
  • The house number, at least 4 inches tall, contrasting and readable from the street.
  • A fire extinguisher, ABC type, 10 pounds or less, within 10 feet of the kitchen.

Inspections run Tuesday or Wednesday, 9 a.m. to 1 p.m., scheduled directly with the fire marshal.

The fee depends on timing: $56 if you apply and pay 10 days before settlement, $125 at 4 to 10 business days, $201 at fewer than 4. One reinspection is free; after that it's $25 each. Newly built homes sold within 60 days of their CO can get the fee and inspection waived.

Where each alarm goes: our smoke and CO alarm guide.

2. The sidewalk inspection

Under Borough Code 199-13.2, once a contract is signed, a party to the sale must notify the borough at least 30 days before closing. An inspector then checks the sidewalk, driveway apron and any walkway in the public right of way.

The trigger is a half inch. A raised crack, hole, crumbled spot or uneven block, brick or slate of 1/2 inch or more counts as a tripping hazard. Inspections happen Tuesdays and Thursdays, no appointment. Problems get marked in white spray paint, and the result comes by email.

Repairs have to be done, and the borough told, at least 7 days before closing. If that can't happen, the ordinance lets the money sit in escrow and the work be finished within 30 days after closing.

Cost: $50, which covers the first inspection and one check after repairs. More reinspections are $25 each, and late notice adds $25 per miss.

Condos in Haddonfield Commons, The Mews, Kings Court and the Townhomes on Washington skip it, per the borough.

3. The Historic District disclosure

Under Code 135-60, if the house is in the Historic District or is a landmark, the seller gives buyers the borough's preprinted information on exterior changes, with everyone's signatures, by the contract signing. It's free, and it doesn't apply to buildings constructed after 1978. What it means for buyers: our Historic District guide.

Sources

Thinking about selling or buying in town? The Friday newsletter rounds up every new Haddonfield listing with its agent and brokerage. Subscribe here.

FAQ

How much is Haddonfield's smoke detector inspection for a home sale?
$56 if you apply and pay at least 10 days before settlement, $125 at 4 to 10 business days and $201 at fewer than 4, per the borough. One reinspection is free.
Do I need a sidewalk inspection to sell a condo in Haddonfield?
Not in Haddonfield Commons, The Mews, Kings Court or the Townhomes on Washington, according to the borough's resale page.
Can I close if the sidewalk repair isn't finished?
The ordinance allows money to be escrowed for the repair, which then has to be done within 30 days after closing. The inspector can extend that for weather.

Get Live Haddonfield in your inbox

The best of life in 08033, every Friday. Free.

Subscribe on Substack

More from Homes & Design